Hydroelectric Energy Current Transforming Stations |
Mandate
All the surveying required for the civil engineering work leading to the construction, repair or retrofitting of the following hydroelectric current transforming stations.
This involved all ground preparation work, including excavation and backfilling, layout of the anchorage and formwork for concreting, and layout of the various infrastructures making up the project.
-
Les Boules Station - Transelec/Common inc.
- Frégau Station - Construction Saint-Arnaud inc.
- Québec II and Frontenac I and II Stations -
Construction Saint-Arnaud inc.
- Lévis Station - Transelec/Common inc.
- Laurentides Station - Rial Électrique inc.
Client
La Cie Wilfrid Allen Ltée
Mandate
Various surveying tasks as part of the rehabilitation of the Town of Trois-Pistoles' water supply and sewer system. Layout of the water and sewer system over a distance of 800 metres, for connection to the existing network. Layout of two access roads leading to the wastewater treatment plant and pumping station, as well as the basic structure for construction of the wastewater treatment plant and pumping station, and the retention ponds and sludge drying beds.
Municipality of Saint-François-de-la-Rivière-du-Sud |
Client
La Cie Wilfrid Allen Ltée
Mandate
Layout of the water and sewer system over a distance of 1,500 metres, as well as the basic structure required for construction of the wastewater treatment plant and pumping station, and the sludge drying bed.
Vehicle and Metal Shredding Plant |
Clients
Groupe Canam inc . / Les Excavations Lafontaine inc.
Mandate
Surveying work for construction of a vehicle and metal shredding plant in Lévis.
Groupe Giroux was commissioned to carry out all construction and technical surveying work for the construction of municipal streets, roads and facilities such as soccer fields and playing fields.
Client
Cegerco inc.
Mandate
Technical surveys required for restoration of some of the facilities on the site of Ultramar's Jean-Gaulin Refinery.
Client
SM Construction inc.
Mandate
Surveying work required for the excavation and layout of formworks and pilings, layout of the foundations, and layout of several of the structures making up the hospital's new magnetic resonance department.
Les Brises du Fleuve V Condominium Corporation |
Client
Roche Construction inc.
Mandate
Surveys required for levelling of a 12-storey building and underground garage.
Chaudière River Hydroelectricity Power Station |
Client
Innergex
Mandate
Surveys required for construction of the dam located on the Chaudière River between Charny and Saint-Nicolas, now part of the City of Lévis.
During this project, we were responsible for the surveys needed to plan construction of the hydro-electric power station. Among other things, we had to produce the topographical and digital plans showing the cross-section of the river bed before construction of the dam. We then had to prepare the technical descriptions of the riparian plots to be acquired for the project. Lastly, we drew up a photogrammetric plan that was used to study the water flow.
Clients
IntraGaz et Gaz Métropolitain
Mandate
Surveys required for construction of the pipeline between Saint-Nicolas and Saint-Flavien, and another pipeline between the Chaudière-Appalaches, the Beauce and the Eastern Townships regions.
Groupe Giroux established the pipeline boundaries and then proceeded with the layout. We then produced the surveys and mapping of the pipeline and all its components as built, including pipes, bends and bolts.
Groupe Giroux periodically produces the piling layouts required for pouring of the concrete for the extension to the compressor installation at Saint-Flavien.
Client
Roche Construction inc.
Mandate
Surveys and calculations required for layout of the new landscaping concept, the water and sewer systems and the parking lot. Summary plan of the survey as built.
|